Sign in

Drawing 01 · HVAC & climate · industry package

You install
the supply.
You install
the return.
Who installs
the system?

A plant room takes eleven weeks, four trades and a commissioning certificate. Your business runs on a spreadsheet, three apps and an engineer's memory. 8nterp puts the whole job — survey to service contract — on one spine.

Supply · heat Return · cool Controls · 8nterp
Section A–A · commercial fit-outLive
ROOF PLANTLEVEL 02LEVEL 01 AHU 8NTERP
AThe job · five stages

Five stages.
Five places the money goes missing.

Watch a commercial system go in. At every stage the steel behaves exactly as designed — and a piece of information falls on the floor. That information is your margin.

Section A–A · build sequence01 Survey
ROOF PLANTLEVEL 02LEVEL 01 AHU 21.4 °C 0.42 m³/s 8NTERP
1STAGE 01

The survey

An engineer walks the building, measures the loads, and prices the job. Heat gain, duct routes, plant space, access. The quote goes out at six days of labour and a fixed equipment schedule.

What falls on the floor

The quote lives in a document. Nothing connects it to the hours worked against it — so an overrun is invisible until the job is closed and the money is already spent.

2STAGE 02

The plant

Condensers land on the roof, the air handling unit is craned in onto anti-vibration mounts. Filters, preheat coil, cooling coil, reheat coil, fan. Serial numbers, refrigerant charge, warranty terms.

What falls on the floor

Serial numbers go on a photo in someone's phone. Warranty registration is a task nobody owns, and the F-gas charge log is a spreadsheet the auditor will eventually ask for.

3STAGE 03

The distribution

Supply runs the riser and out along each floor; return comes back to the plant. Hung, sealed, pressure-tested. This is where the eleven weeks go: four trades sequencing around each other in one ceiling void.

What falls on the floor

Hours are written on paper and typed up on Friday, badly. Van stock walks. The variation the client asked for on Tuesday is agreed verbally and never priced.

4STAGE 04

The terminals

Cassettes and diffusers go into the ceiling grid, drains fall correctly, condensate is proved. The part the client will actually look at every day for fifteen years.

What falls on the floor

Snags are captured on WhatsApp. Which of forty terminals was replaced under warranty in month three is a question no system can answer.

5STAGE 05

Commissioning

Airflows balanced, temperatures proved, controls strategy demonstrated, certificate issued, O&M manual handed over. The job is done — and the most valuable part of it has not started.

What falls on the floor

The service contract. The recurring revenue that makes this business worth owning is tracked in a calendar reminder, and it quietly lapses.

BThe arithmetic · your figures

It is not a software problem.
It is a margin problem.

Nobody buys a platform because the tabs are nicer. Move the two sliders and see what the gaps cost you in a year. The assumptions are printed underneath — change them in the meeting if you disagree.

People who log billable hours.

12

Average billed per engineer hour.

€78
Annual capacity

€1,404,000

Where it goesPer year
Leaked, annually€0

Assumptions: 1,500 billable hours per engineer per year; 4% of worked hours never reach an invoice; 3% of project value lost to un-priced variation and undetected overrun; 8% of the service base lapses at renewal; €900 of van stock per engineer written off. Conservative against published field-service benchmarks, and every one is arguable — bring your own.

A twelve-engineer contractor is leaking €0 a year.

CTwo consoles · one spine

Your client is looking at
the same row you are.

Most contractors bolt a customer portal onto the side and reconcile it nightly. There is nothing to reconcile here. The client's project view and your job record are the same row, filtered — so the moment you move a job to Commissioning, their screen says Commissioning.

Owner console · /admin

Run the company

  • Live dashboard — active jobs, paid this month, outstanding, unbilled hours, recurring base
  • Jobs through the five stages, with logged hours against quoted while the job is running
  • Customers — what each has running, owes and renews
  • Invoices with an overdue count that chases itself
  • Equipment register — serials, refrigerant charge, warranty countdown
  • Service contracts with renewal dates before they lapse
  • Time, and the unbilled figure that is the most commonly lost money in this trade
  • Client requests, landing straight in the queue

Client portal · /portal

Keep the client out of your inbox

  • Where my project is — the same five stages, live
  • My systems — every unit, its serial, its warranty countdown
  • Documents — certificates, O&M manuals, F-gas records
  • Invoices, with drafts never shown
  • Request service — straight into your engineers' queue
  • Their service cover and when the next visit is due

Both are live on this site right now. Sign in and move a job in the owner console, then look at it as the client.

DThe package · nine of sixteen

Nine modules, one spine

Not a discount bundle. The nine of 8nterp's sixteen modules that a climate contractor actually runs on, pre-configured to the way the work already happens — sharing one customer, one product list, one ledger.

Stage 01

CRM & quoting

The survey, the load calculation and the quote become the same object the job is later measured against.

Stage 01–05

Project management

Programme, trades, dependencies. The eleven weeks, visible while they are happening.

Stage 02

Warehouse & van stock

Serial numbers, refrigerant charge and every part booked to the job it went into.

Stage 02

Logistics

Crane slots, deliveries and engineer routing, against the programme rather than beside it.

Stage 03

HRM & payroll

Hours captured on the phone at the job. Timesheet, payroll and invoice are the same number.

Stage 03

ERP & finance

Variation priced when it is agreed. Cost and revenue on the job while it can still be steered.

Stage 04

Document management

Certificates, O&M manuals, F-gas logs and warranties, filed to the asset and findable in a year.

Stage 05

Service contracts

Every commissioned system becomes a renewal with a date and an owner — never a calendar reminder.

All stages

Business intelligence

Margin per job, per engineer, per client. Which work to stop taking, in a number.

EHow you buy · three ways

Three ways in. One spine underneath.

Every path lands on an annual agreement plus a one-time implementation. Land on the modules that hurt most; expand when the first ones have paid for themselves.

Option A

Per module

Take one. Most contractors start where the bleeding is worst.

  • Hours and payroll, or
  • Service contracts, or
  • Stock and serials

Option B · recommended

The HVAC package

The nine modules above, pre-configured to the five stages, implemented against your live jobs.

  • Migration of customers, assets and contracts
  • Configured to your certificates and F-gas obligations
  • Engineers trained on their own jobs, not a demo

Option C

Build your own

Three, six, nine, twelve or all sixteen, with volume pricing.

  • For groups running more than climate
  • Adds recruitment, training, security
  • Same spine, wider footprint
FThe decision

You would never install a system you had not surveyed.

So do not run one either. We survey your business the way your engineers survey a building: measure what is actually happening, price the gap, and show you the number before you commit to anything.

Ninety minutes, on your own jobs and your own figures. You leave with the leak quantified whether or not you ever buy a licence.